| PRICE – FULLY FINISHED AND DELIVERED | METERS (M) | FEET (FT) | ||
| WIDTH | 6.7 | 22.0 | ||
| LENGTH | 19.8 | 65.0 | ||
| PRICE AND QUALITY OPTIONS | TOTAL | |||
| Basic Standard Mobile Home BS:3632 | £94,571 | |||
| High Standard Mobile Home BS:3632 | £115,151 | |||
| Very High Standard Mobile Home / Build Regulation | £139,108 |
| EXAMPLE PRICE – Basic Standard Mobile Home BS:3632 | ||||
| TIMBER FRAME STRUCTURE – DESIGN AND ENGINEERING | £39,135 | |||
| WINDOW AND DOOR – UPVC PLASTIC IN WHITE | £4,786 | |||
| ROOF FINISH – BITUMEN FELT SHINGLE TILE | £4,475 | |||
| EXTERIOR FINISH – TEXTURED PAINT | £3,042 | |||
| SOFFIT AND FASCIA – UPVC PLASTIC | £1,592 | |||
| RAINWATER GOODS – UPVC PLASTIC | £524 | |||
| INSULATION – STANDARD GLASS MINERAL WOOL ROLL | £3,202 | |||
| WALL LININGS – STANDARD PLASTERBOARD AND SKIM | £7,358 | |||
| HEATING – BASIC COMBINATION BOILER WITH CONVECTION RADIATORS | £5,248 | |||
| PLUMBING | £4,635 | |||
| ELECTRICS | £6,231 | |||
| KITCHEN | £5,100 | |||
| INTERNAL DOORS AND CARPENTRY – BASIC PANEL DOORS, SOFTWOOD LINING, FURNITURE | £2,508 | |||
| MDF SKIRTING, ARCHITRAVE AND SILLS | £1,145 | |||
| FLOOR FINISH – CARPET | £2,182 | |||
| WALL TILING – VINYL SHEET TILE | £220 | |||
| DECORATING WALLS – STANDARD EMULSION DECORATING WALLS AND CEILING | £2,081 | |||
| DECORATING SKIRTING AND ARCHITRAVE – | £1,108 | |||
| TOTAL | £94,571 | |||
| EXAMPLE PRICE – High Standard Mobile Home BS:3632 | ||||
| TIMBER FRAME STRUCTURE – DESIGN AND ENGINEERING | £41,456 | |||
| WINDOW AND DOOR – FACTORY PAINTED TIMBER | £7,860 | |||
| VELUX ROOF LIGHTS | £512 | |||
| ROOF FINISH – METROTILE | £7,607 | |||
| EXTERIOR FINISH – WEATHERBOARD | £5,903 | |||
| SOFFIT AND FASCIA – UPVC PLASTIC | £1,592 | |||
| RAINWATER GOODS – UPVC PLASTIC | £524 | |||
| INSULATION – GLASS MINERAL WOOL SLAB | £5,150 | |||
| WALL LININGS – STANDARD PLASTERBOARD AND SKIM | £7,358 | |||
| HEATING – QUALITY COMBINATION BOILER WITH DESIGNER RADIATORS | £6,745 | |||
| PLUMBING | £4,635 | |||
| ELECTRICS | £6,231 | |||
| KITCHEN | £5,100 | |||
| INTERNAL DOORS AND CARPENTRY – QUALITY TIMBER DOORS, SOFTWOOD LINING, FURNITURE | £3,660 | |||
| MDF SKIRTING, ARCHITRAVE AND SILLS | £1,145 | |||
| FLOOR FINISH – REAL OAK ENGINEERED FLOORING | £5,492 | |||
| WALL TILING – CERAMIC TILED WALLS | £550 | |||
| DECORATING WALLS – STANDARD EMULSION DECORATING WALLS AND CEILING | £2,081 | |||
| DECORATING SKIRTING AND ARCHITRAVE – GLOSS WOODWORK AND OIL DOORS | £1,550 | |||
| TOTAL | £115,151 | |||
| EXAMPLE PRICE – Very High Standard / Build Regulation | ||||
| TIMBER FRAME STRUCTURE – DESIGN AND ENGINEERING | £41,456 | |||
| WINDOW AND DOORS – ALUMINIUM CLAD SOFTWOOD | £15,530 | |||
| VELUX ROOF LIGHTS AND SUNTUBES | £869 | |||
| ROOF FINISH – CAMBRIAN SLATE COMPOSITE INTERLOCKING TILES | £11,154 | |||
| EXTERIOR FINISH – WESTERN RED CEDAR (PEFC Certified) | £6,161 | |||
| SOFFIT AND FASCIA – ALUMINIUM | £5,064 | |||
| RAINWATER GOODS – ALUMINIUM | £1,073 | |||
| INSULATION – FOAM BOARD KINGSPAN/CELOTEX | £12,823 | |||
| WALL LININGS – STANDARD PLASTERBOARD AND SKIM | £7,358 | |||
| HEATING – QUALITY COMBINATION BOILER WITH DESIGNER RADIATORS | £6,745 | |||
| PLUMBING | £4,635 | |||
| ELECTRICS | £6,231 | |||
| KITCHEN | £5,100 | |||
| INTERNAL DOORS AND CARPENTRY – QUALITY TIMBER DOORS, SOFTWOOD LINING, FURNITURE | £3,660 | |||
| OAK SKIRTING, ARCHITRAVE AND SILLS | £1,872 | |||
| FLOOR FINISH – REAL OAK ENGINEERED FLOORING | £5,492 | |||
| WALL TILING – NATURAL STONE / MARBLE TILED WALLS | £880 | |||
| DECORATING WALLS – STANDARD EMULSION DECORATING WALLS AND CEILING | £2,081 | |||
| DECORATING SKIRTING AND ARCHITRAVE – OIL TO WOODWORK AND DOORS | £924 | |||
| TOTAL | £139,108 | |||
| SCOPE OF WORKS | ||||
| DESIGN AND ENGINEERING | ||||
| Floorplan, 4 Side Elevation Drawing, Sectional Drawing | INCLUDED | |||
| Groundwork Setting Out Diagram | INCLUDED | |||
| Caravan Compliance Report | INCLUDED | |||
| EXTERNAL WORKS | ||||
| Site Clearance | EXCLUDED | |||
| Foundations | EXCLUDED | |||
| Perimeter breeze-block wall 2-course (for mobile homes) | EXCLUDED | |||
| Service Trenches | EXCLUDED | |||
| Soak-away and Drainage | EXCLUDED | |||
| Decking / Paving | EXCLUDED | |||
| SERVICE CONNECTIONS | ||||
| Water, Electric, Gas, Waste – Local service connection only | INCLUDED | |||
| STRUCTURAL | ||||
| Timber Frame Building Manufacture | INCLUDED | |||
| Trucking | INCLUDED | |||
| Construction | INCLUDED | |||
| Supply and Fit External Windows and Doors | INCLUDED | |||
| External Wall Finish | INCLUDED | |||
| Supply and Fit Roof Finish + Rainwater goods | INCLUDED | |||
| Supply and Fit External Soffit and Fascia | INCLUDED | |||
| INTERNAL | ||||
| 1st Fix Plumbing | INCLUDED | |||
| 2nd Fix Plumbing | INCLUDED | |||
| 1st Fix Electrics | INCLUDED | |||
| 2nd Fix Electrics | INCLUDED | |||
| Supply and Fit Insulation | INCLUDED | |||
| Supply and Fit Internal Lining | INCLUDED | |||
| Decorating | INCLUDED | |||
| Supply and Fit Internal Carpentry + Kitchen | INCLUDED | |||
| Supply and Fit Floor Finish | INCLUDED |